MAMMOTH RESOURCES CORP. : http://www.mammothresources.ca/ : QwikReport

Maps, Images and Photographs

Date Title
December 5, 2018 Figures to Accompany December 5, 2018 Press Release - Mammoth Provides Corporate Update on Exploration Activities at its Tenoriba Project.
Surface Map - Surface Drill Hole Location Map w/ Longitudinal Section Location - Tenoriba Property
Longitudinal Section - Tenoriba Property
Summary Table of Assay Results from 2017-18 Diamond Drill Program
July 19, 2018 Figures to Accompany July 19, 2018 Press Release - Mammoth Intersects Multiple Gold Intersections Totalling 61.5 Metres in Step-Out Drill Hole.
Surface Map - Drill Hole Locations- Tenoriba Property
Surface Map - Drill Hole Locations-Masuparia Area, Tenoriba Property
Drill Section - Drill Hole TEN 17-09
Drill Section - Drill Hole TEN 17-10
Summary Table of Assay Results from Masuparia Area
April 26, 2018 Figures to Accompany April 26, 2018 Press Release - Mammoth Intersects 58.2 Metres Grading 0.80 Grams per Tonne Gold Equivalent.
Surface Map - Drill Hole Locations
Drill Section - Drill Hole TEN 17-06
Drill Section - Drill Hole TEN 17-08
Summary Table of Assay Results from Diamond Drilling
April 12, 2018 Figures to Accompany April 12, 2018 Press Release - Mammoth Intersects 45.4 Metres Grading 0.63 Grams per Tonne Gold Equivalent.
Drill Location
Geophysical Section drill hole TEN 17-04
Geophysical Section drill hole TEN 17-07
March 1, 2018 March 1, 2018, Photos from the field - Coming in for a landing at airstrip in Dan Juan de Nepomuceno, 20 minutes from the field camp.
Structural deformation a result of faulting visible in shallow dipping (left half of image) versus horizontal (right half of image) lithologies across a canyon at Tenoriba property.
Studying drill core at Tenoriba camp.
Studying outcrop along drill road at Tenoriba property.
Drilling at Carneritos area, Tenoriba project.
Studying drill core at the drill site,?Carneritos area, Tenoriba project.
Road marker, drill road, Tenoriba project.
BBQ lunch, field camp, Tenoriba project.

March 1, 2018 Figures to Accompany March 1, 2018 Press Release - Mammoth Resources Intersects 10 metres grading 2.93 grams per tonne gold - Images pending
January 23, 2018 Figures to Accompany January 23, 2018 Press Release - Mammoth Reports Initial Results from Diamond Drilling
December 14, 2017 Drill Mobilization, Road Construction and Drilling Core Cutting Core Dozer Dozer Dozer Road Cut Drilling Drilling Drill Mob Walking Drill
August 9, 2017 New photos of channel sampling program Carnerito Line 3a Moreno line 1 Moreno line 1b
January 26, 2017 Geology, ISM & Gold Eq. (gpt)
January 25, 2017 IP Geophysics Survey - Trend of High Resistivity

Copyright © 2018 by Mammoth Resources Corp.   All rights reserved worldwide.
For more information, send questions and comments to
This page was created on Sun Dec 9, 2018 at 11:15:55 PM Pacific Time.