Date |
Title |
January 6, 2021 |
Figure to Accompany January 6, 2021 Press Release - Mammoth Receives
Drill Permit for 139 Drill Locations on its Tenoriba Gold Project, Mexico.
Location Map, Geology-Chip/Channel-2008/2018 Drilling and Centerra Proposed
Drilling. |
October 19,
2020 |
Pictures accompanying press release dated October 19, 2020
1
2
3
4
5
6
7
8
9
10
11
12 |
December 5, 2018 |
Figures to Accompany December 5, 2018 Press Release - Mammoth Provides
Corporate Update on Exploration Activities at its Tenoriba Project.
Surface Map - Surface Drill Hole Location Map w/ Longitudinal
Section Location - Tenoriba Property
Longitudinal Section - Tenoriba Property
Summary Table of Assay Results from 2017-18
Diamond Drill Program |
July 19, 2018 |
Figures to Accompany July 19, 2018 Press Release - Mammoth Intersects Multiple Gold Intersections Totalling 61.5 Metres in Step-Out Drill Hole.
Surface Map - Drill Hole Locations- Tenoriba Property
Surface Map - Drill Hole Locations-Masuparia Area, Tenoriba Property
Drill Section - Drill Hole TEN 17-09
Drill Section - Drill Hole TEN 17-10
Summary Table of Assay Results from Masuparia Area |
April 26, 2018 |
Figures to Accompany April 26, 2018 Press Release -
Mammoth Intersects 58.2 Metres Grading 0.80 Grams per Tonne Gold Equivalent.
Surface Map - Drill Hole Locations
Drill Section - Drill Hole TEN 17-06
Drill Section
- Drill Hole TEN 17-08
Summary Table of Assay Results from Diamond
Drilling |
April 12, 2018 |
Figures to Accompany April 12, 2018 Press Release -
Mammoth Intersects 45.4 Metres Grading 0.63 Grams per Tonne Gold
Equivalent.
Drill Location
Geophysical Section drill hole TEN 17-04
Geophysical Section drill hole TEN 17-07 |
March 1, 2018 |
March 1, 2018, Photos from the field - Coming in for a landing at airstrip in Dan Juan de Nepomuceno, 20 minutes from the field camp.
Structural deformation a result of faulting visible in shallow dipping (left half of image) versus horizontal (right half of image) lithologies across a canyon at Tenoriba property.
Studying drill core at Tenoriba camp.
Studying outcrop along drill road at Tenoriba property.
Drilling at Carneritos area, Tenoriba project.
Studying drill core at the drill site,?Carneritos area, Tenoriba project.
Road marker, drill road, Tenoriba project.
BBQ lunch, field camp, Tenoriba project.
|
March 1, 2018 |
Figures to Accompany March 1, 2018 Press Release - Mammoth Resources Intersects 10 metres grading 2.93 grams per tonne gold - Images pending |
January 23, 2018 |
Figures to Accompany
January 23, 2018 Press Release - Mammoth Reports Initial Results from
Diamond Drilling |
December 14, 2017 |
Drill
Mobilization, Road Construction and Drilling Core
Cutting Core
Dozer
Dozer
Dozer Road Cut
Drilling
Drilling
Drill Mob
Walking Drill |
August 9, 2017 |
New photos of
channel sampling program Carnerito Line 3a Moreno line 1 Moreno line 1b |
January 26, 2017 |
Geology, ISM & Gold Eq. (gpt) |
January 25, 2017 |
IP Geophysics Survey - Trend of High Resistivity |